Aberthaw 275 kV — wall bushings and voltage transformers
The challenge
Aberthaw is a coal-fired station close to the coast, so the Upper Boat 2 circuit collects coal dust, salt and cement on the same porcelain. The wall bushings and voltage transformers had been protected with hydrocarbon grease. By this outage the grease was saturated with surface contamination and no longer stood between the porcelain and a pollution flashover. Saturated grease is also a maintenance job in its own right: it has to come off before the insulation can be trusted again.
The solution
CCS used a five-day outage, 2–6 October 2009, on a scaffold that was already enclosed. All of the hydrocarbon grease was removed from three wall bushings and three voltage transformers, and RTV silicone HVIC was applied in its place. One sprayed coating, put on while the circuit is already out, replaces the cycle of greasing and washing.
The result
The bushings left site under a smooth light-grey RTV silicone film. A hydrophobic surface of this kind makes water bead and run, so pollution is less able to form a continuous conductive path, and the routine of cleaning and regreasing falls away.


Long-term performance
On 21 June 2022 CCS surveyed National Grid’s Aberthaw substation. The coal-fired station is no longer active, so coal-dust pollution is much lower, though exposed coal stores remain and the site is still an exposed coast. Most of the equipment carries RTV silicone HVIC. That original coating has given reliable maintenance-free protection for more than 10 years. CCS recommended cleaning and an overcoat with RTV silicone HVIC.