1997 to 2026

Experience & projects

CCS Network (ME) Ltd continues a coating business that began in 1997. A later company, then called CCS Network Ltd, was formed to take product distribution globally and to represent the application partner network. Today’s legal entity, as registered at Companies House, is CCS Network (ME) Ltd. Our own applications run from 1997 to date across the United Kingdom, the Republic of Ireland and the Netherlands. We have trained application teams and overseen applications throughout Europe, the Middle East and Africa.

  1. 1997

    An HVIC application company

    Commercial Coating Systems Ltd was founded by Chris Cork and Barry Field as an RTV silicone HVIC application company, for pollution management on high-voltage systems. The first jobs were carried out at Dungeness, Kingsnorth and Heysham.

    Case study (coming soon)
  2. 2003 to 2019

    Master distributor for Dow Corning

    In 2003 CCS became the master distributor for Dow Corning RTV silicone HVIC, and remained so until 2019.

    Case study (coming soon)
  3. 2005

    Sellindge

    The UK reference list records capacitor-coil work at Sellindge.

    Case study (coming soon)
  4. 23 June 2010

    Hinkley Point 400 kV

    Inspection of RTV silicone HVIC, then about seven to eleven years in service, still adherent and suitable for overcoating.

    Case study (coming soon)
  5. May 2013

    Fiddlers Ferry

    The UK reference list records work including Reactor 2.

    Case study (coming soon)
  6. 2019

    Partnership with CSL Silicones

    A distribution agreement was signed on 10 July 2019. CSL and CCS announced a partnership for Si-COAT 570 on 16 and 18 July 2019. The original announcement described an EMEA territory; that description has since been updated.

    Case study (coming soon)
  7. 1997 to present

    Documented UK programme

    With nearly 30 years of HV insulator coating experience, the CCS UK reference list records RTV silicone HVIC application work including circuits at Dungeness, Tod Point, Shoreham, Littlebrook, Aberthaw, Grendon, Pembroke, Fawley, Capenhurst, Blyth, Ratcliffe, Margam, Chickerell, Grain, Cellarhead, Killingholme, West Burton, Eggborough, Bangor, Cottam, Drax, Enderby, Tremorfa, Wylfa, Keadby and many more sites.

    Case study (coming soon)
  8. 1–2 October 2020

    Lincs OFTO, adjacent to Walpole

    Remove existing RTV silicone HVIC, clean and re-apply to a shunt reactor, with patch repairs where required. Recorded for Transmission Capital.

    Case study (coming soon)
  9. 26–27 October 2020

    Heysham Substation

    Remove existing RTV silicone HVIC, clean and re-apply to a reactor coil. Recorded for Transmission Capital Services.

    Case study
  10. October 2020

    Transmission Investment OFTO, B24

    Lower coil coating works.

    Case study (coming soon)
  11. 30 August–16 September 2023

    Choats Road, Barking

    Clean, remove existing RTV silicone HVIC if necessary, and re-apply to two reactor coils. UK Power Networks substation; client Hitachi Energy.

    Case study (coming soon)
  12. September 2023

    Transmission Investment OFTO, B24

    Upper-middle coil coating works.

    Case study (coming soon)
  13. October 2023

    Tilbury 400 kV

    National Grid. Degrease, clean and polish. Not a coating application.

    Case study (coming soon)
  14. 11–13 March 2024

    Sundon Substation

    National Grid. Remove old RTV silicone, clean and coat one reactor coil with Si-COAT 570.

    Case study (coming soon)
  15. 3 April 2025

    Sellindge 400 kV converter station

    Inspection of twelve factory-pre-coated reactor coils. Not an overcoat.

    Case study (coming soon)
  16. March 2026

    Nechells 275/132 kV

    National Grid. Apply Si-COAT 570.

    Case study (coming soon)
  17. May 2026

    Pembroke 400 kV / Swansea North 2

    National Grid. Overcoat.

    Case study (coming soon)

Case studies

SiteCustomerProblemYearPDF
Aberthaw 275 kV, Upper Boat 2National GridCoal dust, salt and cement2009PDF
Blyth 275 kV, FourstonesNational GridSaline pollution2010PDF
Blyth 275 kV, Stella West 2National GridSaline pollution2010PDF
Gortawee 110 kV, Quinn cement worksESBCement dust2010PDF
Fiddlers Ferry 275 kV, Rainhill 1National GridCoal dust2010PDF
Hinkley Point 275 kV cable sealing endsNational GridSaline pollution2010PDF
Hinkley Point 275 kV, SGT6National GridHybrid application trialNot statedPDF
Littlebrook 400 kVNational GridIndustrial and road pollution2008PDF
Sellindge, Pole 3 converterNational GridCascading rain on an inclined bushing2010PDF
Shoreham 132 kV switchyardScottish PowerSea spray2007PDF
Heysham SGT2National GridSalt fog2010PDF
Ratcliffe, generator transformer 3Not named beyond the siteCoal dust2020PDF
The Grange, Port TalbotNot named beyond the siteIndustrial pollution and iron ore dust2020PDF
Margam, Baglan Bay L13Not named beyond the siteIndustrial pollution2020PDF
Dungeness 400 kV substationNot named beyond the siteCorrosion from water and salt2020PDF
FrodshamNot statedWall bushings before coating, during application, and after coatingNot statedPDF
Swansea NorthNot statedWall bushings and posts before and after coatingNot statedPDF
Tod PointNot statedCurrent transformers and disconnect posts, coatedNot statedPDF
RocamoraNot statedPost insulators during preparation and coatingNot statedPDF

Reactor-coil jobs are listed in full on the Reactor coils page.