The Grange, Port Talbot — 66 kV insulators

Site:
The Grange substation, Port Talbot
Customer:
Tata Steel
Date of application:
June 2020
Pollution type:
Industrial pollution and iron ore dust
Equipment:
64 insulators, 66 kV, coated before installation
After
After

The challenge

The Grange substation at Port Talbot is on an industrial coast, and iron-ore dust is part of the local pollution. These 64 insulators are high-creepage designs. Additional creepage is effective only while the surface remains clean, and the local pollution was still present. The insulators had no coating.

The solution

The insulators were coated at ground level on 14 June 2020, before they were placed in service, so a live-bay outage was not required. Surface pollution was removed and the glaze was polished. RTV silicone HVIC was sprayed to between 360 and 500 microns. Temperature, humidity and batch numbers were recorded, and adhesion, thickness and hydrophobicity were checked.

The result

Adhesion, thickness and hydrophobicity were checked and found satisfactory. The 64 insulators of 66 kV were installed with a hydrophobic coating already on the glaze, before they were exposed to iron-ore dust in service.

Before
Before
Finished coating
Finished coating