The challenge
The three 400 kV surge arresters had previously been coated with hydrocarbon grease as protection against pollution-induced flashover. Littlebrook stands on the Thames near the Dartford crossing and the surrounding industrial area. Industrial and road pollution, together with high rainfall, had saturated the grease. It was no longer effective.
A polluted surface causes the arrester porcelain to become hydrophilic, which results in wetting during high levels of moisture or rainfall. This can cause arcing and tracking on the surface, and can ultimately lead to flashover.
The solution
From 11 August 2008, working from a scaffold over four days, the hardened grease was removed. Corona rings and other metal parts were masked, and three coats of RTV silicone HVIC were sprayed to a thickness of 0.5 mm.
The result
A hydrophobic coating, applied to the specified 0.5 mm thickness, now covers the surface of the surge arresters, replacing the grease which had been degraded by rain and local pollution. Adhesion and thickness were checked and recorded as sufficient. This coating is designed to remain in service without the need for routine washing or regreasing.