Experience & projects

Case study

CCS Network (ME) Ltd
CCS Network (ME) Ltd

Shoreham 132 kV switchyard

Site:
Shoreham power station, 132 kV switchyard
Customer:
Scottish Power
Date of application:
August 2007
Pollution type:
Sea spray from the English Channel
Equipment:
Switchyard insulators, 132 kV
After
After

The challenge

The 132 kV switchyard is close to the English Channel, and sea spray is deposited directly on the insulators. An RTV silicone coating applied about five years earlier had poor adhesion because the surface preparation had been inadequate. By 2007 the hydrophobicity was no longer adequate, and electrical activity had been noticed. Scottish Power required the protection to be restored, with the porcelain properly prepared before the new coating was applied.

The solution

In August 2007, working from a scaffold over eight days, the original coating was removed by high-pressure water jet. The surfaces were cleaned with solvent and wiped with isopropyl alcohol immediately before spraying. Metal parts were masked. Three coats of RTV silicone HVIC were applied to a thickness of 0.5 mm.

The result

Adhesion and thickness were checked and recorded as sufficient. The switchyard insulators were returned with a 0.5 mm hydrophobic coating on porcelain that had been prepared before application. The coating is designed to remain in service in sea spray without routine washing or regreasing.

Before
Before

Download PDF

CCS Network (ME) Ltd. www.ccs-network.com