Ratcliffe — generator transformer 3

Site:
Ratcliffe on Soar
Customer:
National Grid
Date of application:
June 2020
Pollution type:
Coal dust
Equipment:
3 wall bushings, 3 post insulators, 1 voltage transformer, 3 underslung insulators and 3 transformer bushings, 400 kV
After
After

The challenge

The 400 kV porcelain on generator transformer 3 at Ratcliffe on Soar is exposed to coal dust. The equipment had previously been coated with hydrocarbon grease, last applied an estimated five or more years earlier. The grease had become saturated with surface contaminants and was no longer effective against flashover. Saturated grease can also support tracking at the interface with the porcelain.

A polluted porcelain surface becomes hydrophilic. Wetting during rainfall can lead to leakage current, arcing and tracking, and ultimately to flashover.

The solution

On 30 June 2020 the grease was removed and the porcelain was cleaned back to the glaze. RTV silicone HVIC was sprayed in several coats to 500 ± 140 microns. Temperature, humidity and batch numbers were recorded. Hydrophobicity was checked, and a small patch was cut on each phase to confirm adhesion and thickness.

The result

Hydrophobicity, adhesion and thickness were checked on each phase. A hydrophobic coating at 500 ± 140 microns now covers the porcelain, replacing the saturated grease. The coating is designed to remain in service without routine washing or regreasing.